PROJECTS
Kumho Tire in Macon
Hankook Tire Plant
($24 Million Contract)
Work Scope:
HVAC: Install Water Cool Chillers, Cooling Tower, Chilled and cool water Pumps, Chill Water Pipes and Insulation Large Size Make Up Air, Roof Top Units, Dehumidified Units, VRF,
Environmental Duct, Spiral Duct, Hood System, Exhaust Fans,
Plumbing: Domestic Water Line, Electric Water Coolers, all of Restroom Fixtures,
Construction Period: Aug 2015 to Feb 2017
($14.4 Million Contract)
Work Scope
HVAC: Install Ductless VRF, AHU, Chilled Water Connection, Exhaust Fans, Sheet Metal Duct
Plumbing: Domestic Water Line, Electric Water Coolers, all of Restroom Fixtures,
Construction Period: April 2015 to March 2016.
Upcoming Projects
Seoyon E-Hwa
Coming Soon